EV Charging Stations by State: Public Ports, Ports per EV and Growth, 2023 to 2026

Department of Energy station counts for all 50 states and DC, normalised by registered plug-in EVs and population, show where public charging has kept pace with EVs and where it has not.
Four DC fast charging pedestals beside a pad-mounted transformer and switchgear at a highway rest area
Data
U.S. DOE Alternative Fuels Data Center: Station Locator counts by state (public EV charging) and Vehicle Registration Counts by State
Period
Station snapshots October 26, 2023 to October 26, 2026; registrations 2023 and 2025; population July 1, 2025
Release used
2026-10-26
Next release
AFDC station counts update continuously; registration counts are published once a year (latest year: 2025)
Geography
50 states and the District of Columbia
Sources
18 (14 official)
The answer

EV charging stations by state, as of October 26, 2026: the US had 83,527 public station locations with 262,507 charging ports, led by California with 69,621 ports. Against registered plug-in EVs, New Jersey has the fewest ports (20.1 per 1,000 EVs) and Connecticut gained the most ports per EV since 2023.

262,507public EV charging ports in the US on October 26, 2026, at 83,527 station locations[1]
31.9public ports per 1,000 registered plug-in EVs at the end of 2025, down from 33.0 at the end of 2023[2][4]
70.0%growth in US public ports from October 2023 to October 2026 (DC fast ports: 126.9%)[1][2]
20.1public ports per 1,000 plug-in EVs in New Jersey, the lowest of any state, end of 2025[2][4]

EV charging stations by state: California holds 26.5% of US public ports

Raw counts track population and EV ownership, so the largest states lead. California's 69,621 public ports are more than three times the 20,419 in second-placed New York.

On October 26, 2026 the DOE Alternative Fuels Data Center (AFDC) listed 83,527 public EV charging station locations with 262,507 charging ports across the 50 states and DC (AFDC Station Counts by State). A station location is a physical place such as a parking lot; a port is one vehicle charging at a time.

California had 69,621 public ports at 20,379 locations, 26.5% of the national total. The five largest states by ports (California, New York, Florida, Texas and Massachusetts) held 130,427 ports, or 49.7% of the US count. At the other end, Alaska had 194 public ports, North Dakota 283 and South Dakota 330.

Per resident the order changes. Vermont had 210.7 public ports per 100,000 residents, ahead of California at 176.9 and Massachusetts at 165.4. Louisiana had 18.4 and Mississippi 24.0, against a US figure of 76.8 (population: Census Bureau Vintage 2025, July 1, 2025).

Public EV charging ports per 100,000 residents by state

October 26, 2026 ports; July 1, 2025 population

Public EV charging ports per 100,000 residents by stateUS tile map of public EV charging ports per 100,000 residents. Vermont is highest at 210.7, followed by California at 176.9 and Massachusetts at 165.4. Louisiana is lowest at 18.4 and Mississippi next at 24.0. The US figure is 76.8.AK: 26.3AK26.3ME: 115ME115VT: 211VT211NH: 58.4NH58.4WA: 115WA115ID: 36.7ID36.7MT: 42.0MT42.0ND: 35.4ND35.4MN: 57.0MN57.0IL: 50.1IL50.1WI: 41.0WI41.0MI: 56.5MI56.5NY: 102NY102RI: 79.9RI79.9MA: 165MA165OR: 102OR102NV: 86.8NV86.8WY: 62.0WY62.0SD: 35.3SD35.3IA: 40.3IA40.3IN: 32.1IN32.1OH: 45.5OH45.5PA: 45.4PA45.4NJ: 74.2NJ74.2CT: 135CT135CA: 177CA177UT: 91.5UT91.5CO: 132CO132NE: 39.5NE39.5MO: 53.2MO53.2KY: 26.3KY26.3WV: 30.8WV30.8VA: 62.4VA62.4MD: 90.2MD90.2DE: 68.4DE68.4AZ: 63.2AZ63.2NM: 60.0NM60.0KS: 48.6KS48.6AR: 35.6AR35.6TN: 43.0TN43.0NC: 53.0NC53.0SC: 40.4SC40.4DC: 156DC156OK: 40.3OK40.3LA: 18.4LA18.4MS: 24.0MS24.0AL: 33.8AL33.8GA: 67.9GA67.9HI: 73.1HI73.1TX: 41.4TX41.4FL: 65.7FL65.7PR18.4 to 35.435.4 to 42.042.0 to 56.556.5 to 68.468.4 to 102102 to 211ports per 100,000 residents

Source: U.S. DOE Alternative Fuels Data Center, Station Counts by State (data as of 2026-10-26); U.S. Census Bureau Vintage 2025. ECW Data Desk calculation.

The 20 states with the most public EV charging ports

Public ports, October 26, 2026

The 20 states with the most public EV charging portsHorizontal bar chart of public EV charging ports by state. California leads with 69,621 ports, followed by New York with 20,419, Florida with 15,426, Texas with 13,127 and Massachusetts with 11,834.portsCalifornia69,621New York20,419Florida15,426Texas13,127Massachusetts11,834Washington9,169Colorado7,963Georgia7,679New Jersey7,088Illinois6,369Pennsylvania5,933North Carolina5,930Michigan5,727Maryland5,651Virginia5,539Ohio5,415Connecticut4,981Arizona4,822Oregon4,351Missouri3,337

Source: U.S. DOE Alternative Fuels Data Center, Station Counts by State (2026-10-26)

Public EV charging stations and ports by state, October 26, 2026 Download CSV
Show all 52 rows
RankStateStation locationsPublic portsLevel 2 portsDC fast portsDC fast share (%)Ports per 100,000 residents
1California20,37969,62149,69219,63328.2176.9
2New York5,51820,41917,0963,31416.2102.1
3Florida4,44415,4269,9405,45335.365.7
4Texas3,85813,1277,4445,68343.341.4
5Massachusetts4,61011,8349,8501,97816.7165.4
6Washington3,2189,1696,7302,42426.4114.6
7Colorado2,9347,9636,1951,71321.5132.4
8Georgia2,4027,6795,2352,36730.867.9
9New Jersey2,1327,0884,9042,17330.774.2
10Illinois1,9296,3693,3263,04047.750.1
11Pennsylvania2,0895,9333,8472,07435.045.4
12North Carolina1,9215,9304,0041,91732.353.0
13Michigan2,0775,7273,9301,79331.356.5
14Maryland1,6945,6514,0341,60528.490.2
15Virginia1,8485,5393,6741,84333.362.4
16Ohio1,9375,4153,8451,56628.945.5
17Connecticut1,6674,9814,21176115.3135.0
18Arizona1,5684,8223,2561,56432.463.2
19Oregon1,6714,3512,9661,35031.0101.8
20Missouri1,3393,3372,44189626.953.2
21Minnesota1,1623,3242,2421,06932.257.0
22Utah1,0293,2372,1921,04132.291.5
23Tennessee1,1323,1462,0671,07834.343.0
24Nevada6422,8501,5761,27144.686.8
25Wisconsin9102,4501,47696539.441.0
26South Carolina7102,2521,28796242.740.4
27Indiana7312,2401,1831,05747.232.1
28Alabama5671,75784091552.133.8
29Oklahoma3961,6636421,02061.340.3
30Maine6551,6281,19043526.7115.1
31Kansas5901,4461,05439227.148.6
32Vermont5481,3581,00533724.8210.7
33Iowa4871,30572158444.840.3
34New Mexico4941,27665362148.760.0
35Kentucky4161,21373647339.026.3
36Arkansas3841,11081329726.835.6
37District of Columbia3101,0831,020615.6156.1
38Hawaii4011,04886518317.573.1
39Rhode Island36189071615417.379.9
40Louisiana25985242742549.918.4
41New Hampshire30482747734842.158.4
42Nebraska33779749230538.339.5
43Idaho25874442731742.636.7
44Delaware22872541430942.668.4
45Mississippi22570835835049.424.0
46West Virginia18054432421840.130.8
47Montana15848121926254.542.0
48Wyoming12636516320155.162.0
49South Dakota11433017315747.635.3
50North Dakota10828313714551.235.4
51Alaska701941068845.426.3
United States83,527262,507182,61579,18730.276.8

Ranked by public charging ports. Public access only; temporarily unavailable stations excluded. Ports per 100,000 residents use Census Vintage 2025 population (July 1, 2025).

Source: [1][5] U.S. Department of Energy, Alternative Fuels Data Center; U.S. Census Bureau

DC fast ports grew 126.9% in three years and now make up 30.2% of public ports

Level 2 still accounts for most public ports, but DC fast charging has grown more than twice as fast since 2023 and dominates in several rural states.

Level 2 charging: Alternating-current charging on 208 V (typical commercial) or 240 V (typical residential) service. AFDC lists Level 2 units at 2.9 to 19.2 kW of output.

DC fast charging: Direct-current charging, typically fed by a three-phase AC input, at outputs AFDC lists as up to 500 kW. Also called Level 3.

In October 2026 the US had 182,615 public Level 2 ports, 79,187 public DC fast ports and 693 Level 1 ports (AFDC). In October 2023 the split was 118,584 Level 2 and 34,904 DC fast. DC fast ports grew 126.9% over the three years and Level 2 ports grew 54.0%, so the DC fast share of public ports rose from 22.6% to 30.2%.

The DC fast share varies widely by state. In October 2026 DC fast ports were at least half of public ports in five states, led by Oklahoma at 61.3%, Wyoming at 55.1% and Montana at 54.5%. Dense East Coast markets lean on Level 2: the DC fast share was 16.2% in New York, 15.3% in Connecticut and 5.6% in the District of Columbia.

Because most plug-in hybrids cannot use DC fast charging, a fairer DC fast measure divides by battery EVs only. At the end of 2025 the US had 11.8 public DC fast ports per 1,000 battery EVs. Wyoming had 87.9 and North Dakota 76.3; the District of Columbia had 4.5 and Hawaii 5.0.

US public Level 2 and DC fast charging ports, 2023 to 2026

Snapshots on October 26 of each year

US public Level 2 and DC fast charging ports, 2023 to 2026Line chart of US public charging ports. Level 2 ports rose from 118,584 in October 2023 to 182,615 in October 2026. DC fast ports rose from 34,904 to 79,187 over the same period.050,000100,000150,000200,000portsOct 2023Oct 2024Oct 2025Oct 2026Level 2DC fast

Source: U.S. DOE Alternative Fuels Data Center, Station Locator historical counts

US public charging snapshots, Level 2 versus DC fast, 2023 to 2026 Download CSV
Snapshot dateStation locationsPublic portsLevel 2 portsDC fast portsDC fast share (%)
Oct 26, 202358,801154,432118,58434,90422.6
Dec 31, 202360,495160,403122,05337,56923.4
Oct 26, 202468,371191,707142,99947,88625.0
Oct 26, 202576,949231,090166,66763,68627.6
Dec 31, 202578,432238,009170,26866,98528.1
Oct 26, 202683,527262,507182,61579,18730.2

Public access, temporarily unavailable excluded. Level 1 ports (693 in October 2026) are not shown as a column but are included in public ports.

Source: [1][2] U.S. Department of Energy, Alternative Fuels Data Center; U.S. Department of Energy, Alternative Fuels Data Center

New Jersey has 20.1 public ports per 1,000 plug-in EVs; Wyoming has 107.4

Dividing ports by registered plug-in EVs reverses much of the raw ranking: several large EV markets have the thinnest public charging per vehicle, while low-EV rural states look well served.

Plug-in EV: In this report, a battery electric vehicle (BEV) plus a plug-in hybrid (PHEV), counted from AFDC light-duty registration estimates derived by the National Laboratory of the Rockies from Experian data and rounded to the nearest 100.

At the end of 2025 the US had 238,009 public ports (December 31, 2025, AFDC historical view) and 7,454,800 registered plug-in EVs (5,689,100 BEVs and 1,765,700 PHEVs). That is 31.9 public ports per 1,000 plug-in EVs, or 31.3 EVs per port.

New Jersey had the lowest ratio at 20.1 ports per 1,000 plug-in EVs (49.7 EVs per port), followed by Hawaii at 21.7, Illinois at 24.4, Florida at 25.3 and Nevada at 25.7. California, with the most ports in the country, had 26.8 per 1,000 EVs, below the national figure. In total 17 of the 51 jurisdictions (50 states and DC) sat below the US ratio of 31.9.

The highest ratios belong to states with few EVs: Wyoming at 107.4, North Dakota at 92.3, West Virginia at 72.6, Maine at 69.9 and Vermont at 68.5. A high ratio there mostly reflects highway corridor chargers serving travellers rather than local demand.

Public charging ports per 1,000 registered plug-in EVs

Ports on December 31, 2025; 2025 battery EV plus plug-in hybrid registrations

Public charging ports per 1,000 registered plug-in EVsUS tile map of public charging ports per 1,000 plug-in EVs at the end of 2025. New Jersey is lowest at 20.1, then Hawaii at 21.7 and Illinois at 24.4. Wyoming is highest at 107.4 and North Dakota next at 92.3. The US figure is 31.9.AK: 36.3AK36.3ME: 69.9ME69.9VT: 68.5VT68.5NH: 31.1NH31.1WA: 26.6WA26.6ID: 30.6ID30.6MT: 41.8MT41.8ND: 92.3ND92.3MN: 34.2MN34.2IL: 24.4IL24.4WI: 35.4WI35.4MI: 34.0MI34.0NY: 55.0NY55.0RI: 53.8RI53.8MA: 59.2MA59.2OR: 30.2OR30.2NV: 25.7NV25.7WY: 107WY107SD: 58.1SD58.1IA: 51.5IA51.5IN: 30.3IN30.3OH: 38.6OH38.6PA: 33.5PA33.5NJ: 20.1NJ20.1CT: 59.8CT59.8CA: 26.8CA26.8UT: 32.4UT32.4CO: 30.2CO30.2NE: 40.2NE40.2MO: 50.9MO50.9KY: 37.4KY37.4WV: 72.6WV72.6VA: 31.2VA31.2MD: 34.0MD34.0DE: 35.3DE35.3AZ: 26.3AZ26.3NM: 47.7NM47.7KS: 48.8KS48.8AR: 63.2AR63.2TN: 42.6TN42.6NC: 37.2NC37.2SC: 41.5SC41.5DC: 60.6DC60.6OK: 29.9OK29.9LA: 29.7LA29.7MS: 65.5MS65.5AL: 50.6AL50.6GA: 37.7GA37.7HI: 21.7HI21.7TX: 26.0TX26.0FL: 25.3FL25.3PR20.1 to 26.826.8 to 32.432.4 to 37.237.2 to 48.848.8 to 59.859.8 to 107ports per 1,000 plug-in EVs

Source: U.S. DOE Alternative Fuels Data Center (station locator historical view; vehicle registration counts, 2025). ECW Data Desk calculation.

Public charging ports per 1,000 registered plug-in EVs by state, end of 2025 Download CSV
Show all 52 rows
Rank (fewest ports per EV first)StateBattery EVs 2025Plug-in hybrids 2025Plug-in EVs 2025Public ports Dec 31 2025Ports per 1,000 plug-in EVsPlug-in EVs per portDC fast ports per 1,000 battery EVs
1New Jersey210,00061,900271,9005,47620.149.79.2
2Hawaii35,1009,40044,50096421.746.25.0
3Illinois164,90051,600216,5005,28724.440.913.1
4Florida450,40088,400538,80013,65025.339.59.4
5Nevada85,60016,100101,7002,61525.738.912.7
6Texas387,40079,900467,30012,16426.038.411.8
7Arizona141,80033,900175,7004,61926.338.09.6
8Washington236,40057,100293,5007,80726.637.68.3
9California1,843,100490,9002,334,00062,61426.837.39.1
10Louisiana22,6005,70028,30084129.733.716.1
11Oklahoma26,80029,10055,9001,66929.933.537.9
12Colorado162,80057,100219,9006,64830.233.19.3
13Oregon98,00038,900136,9004,12930.233.212.1
14Indiana47,20019,40066,6002,01530.333.118.6
15Idaho14,1006,70020,80063630.632.718.2
16New Hampshire16,1009,50025,60079731.132.120.2
17Virginia134,90039,300174,2005,43931.232.012.0
18Utah68,40019,20087,6002,84132.430.810.6
19Pennsylvania113,40055,900169,3005,66633.529.915.4
20Maryland120,50041,500162,0005,50234.029.411.3
21Michigan112,60042,100154,7005,26034.029.413.5
22Minnesota59,80024,80084,6002,89734.229.214.1
23Delaware16,0006,10022,10078135.328.318.3
24Wisconsin41,90018,60060,5002,14035.428.318.7
25Alaska4,1001,3005,40019636.327.621.7
26North Carolina121,00035,500156,5005,82237.226.914.6
27Kentucky20,7008,60029,3001,09537.426.819.7
28Georgia161,20032,900194,1007,31837.726.512.4
29Ohio94,20037,200131,4005,07638.625.914.5
30Nebraska11,8005,50017,30069640.224.919.2
31South Carolina35,70013,70049,4002,05141.524.124.1
32Montana6,9004,20011,10046441.823.935.8
33Tennessee55,40016,10071,5003,04342.623.517.4
34New Mexico16,6007,10023,7001,13047.721.032.6
35Kansas18,7007,80026,5001,29248.820.518.2
36Alabama24,4008,30032,7001,65450.619.834.7
37Missouri43,70019,60063,3003,21950.919.717.6
38Iowa15,1008,80023,9001,23051.519.435.1
39Rhode Island9,8006,30016,10086653.818.613.0
40New York209,300125,100334,40018,39055.018.213.4
41South Dakota3,0002,4005,40031458.117.250.3
42Massachusetts113,90060,000173,90010,30359.216.915.0
43Connecticut48,80026,40075,2004,49559.816.715.4
44District of Columbia12,9004,90017,8001,07960.616.54.5
45Arkansas12,3004,90017,2001,08763.215.820.0
46Mississippi7,2003,00010,20066865.515.344.2
47Vermont11,9007,70019,6001,34368.514.622.8
48Maine11,90010,30022,2001,55269.914.330.8
49West Virginia5,0002,7007,70055972.613.842.8
50North Dakota1,9001,1003,00027792.310.876.3
51Wyoming1,9001,2003,100333107.49.387.9
United States5,689,1001,765,7007,454,800238,00931.931.311.8

Ports as of December 31, 2025 (AFDC historical view) divided by 2025 light-duty registrations of battery EVs plus plug-in hybrids. Registrations are rounded to the nearest 100. Oklahoma's plug-in hybrid count (29,100) is higher than its battery EV count, the only state where that happens, and may reflect a VIN classification artifact.

Source: [2][4] U.S. Department of Energy, Alternative Fuels Data Center; U.S. Department of Energy, Alternative Fuels Data Center

Level 2 chargers mounted on parking garage columns with conduit runs to a shared panel
Illustrative photograph. Generated image, not a specific project.

Public ports rose 70.0% since October 2023, but plug-in EVs grew faster in 40 jurisdictions

Every state added public ports over three years, yet in most of them EV registrations grew faster, and the national pace of net additions slowed in the latest year.

US public ports rose from 154,432 on October 26, 2023 to 262,507 on October 26, 2026, a net gain of 108,075 ports or 70.0% (AFDC historical view). Five states at least doubled their public ports: Connecticut (158.8%), New Jersey (119.2%), New Mexico (109.5%), Alabama (105.5%) and New York (103.2%). The District of Columbia grew 12.0%, Maryland 28.0% and Rhode Island 30.7%.

The national pace slowed in the latest year. Net additions were 37,275 ports in the year to October 2024 (24.1%), 39,383 in the year to October 2025 (20.5%) and 31,417 in the year to October 2026 (13.6%). iSeeCars, using a linear projection of AFDC data, likewise projects 15.5% charger growth in 2026 after 25.7% in 2025.

Fastest growth in public charging ports, 2023 to 2026

Percent change in public ports, October 2023 to October 2026

Fastest growth in public charging ports, 2023 to 2026Horizontal bar chart of three-year growth in public charging ports. Connecticut grew 158.8%, New Jersey 119.2%, New Mexico 109.5%, Alabama 105.5% and New York 103.2%. The US grew 70.0%.percentConnecticut159New Jersey119New Mexico110Alabama106New York103Illinois98.3Idaho92.2Wisconsin92.0Michigan91.8Massachusetts91.2South Carolina89.7Mississippi82.9Minnesota80.5Alaska78.0Oklahoma75.6Washington73.8Florida73.0Tennessee72.5Indiana69.8Iowa69.0

Source: U.S. DOE Alternative Fuels Data Center, Station Locator historical counts. ECW Data Desk calculation.

Public charging port growth by state, October 2023 to October 2026 Download CSV
Show all 52 rows
RankStatePorts Oct 2023Ports Oct 2024Ports Oct 2025Ports Oct 2026Ports addedGrowth 2023 to 2026 (%)DC fast growth 2023 to 2026 (%)
1Connecticut1,9253,4744,4454,9813,056158.893.6
2New Jersey3,2344,3415,3297,0883,854119.2123.6
3New Mexico6097831,0571,276667109.5221.8
4Alabama8551,2931,5781,757902105.5204.0
5New York10,04815,47017,99420,41910,371103.2156.3
6Illinois3,2113,8384,9636,3693,15898.3228.3
7Idaho38750962574435792.2166.4
8Wisconsin1,2761,6692,0482,4501,17492.0157.3
9Michigan2,9863,6455,0535,7272,74191.8174.2
10Massachusetts6,1898,11710,10811,8345,64591.2209.1
11South Carolina1,1871,5921,9042,2521,06589.7131.2
12Mississippi38744864470832182.9212.5
13Minnesota1,8422,2692,8223,3241,48280.5164.6
14Alaska1091251631948578.0158.8
15Oklahoma9471,5201,6991,66371675.693.5
16Washington5,2756,1297,6069,1693,89473.8147.3
17Florida8,91610,78212,89315,4266,51073.0161.3
18Tennessee1,8242,3712,9873,1461,32272.5163.6
19Indiana1,3191,7742,0482,24092169.8137.5
20Iowa7729961,2101,30553369.0105.6
21Georgia4,6245,6736,4707,6793,05566.1146.0
22California41,95748,38361,11869,62127,66465.999.8
23North Carolina3,5744,6315,5885,9302,35665.9113.2
24Colorado4,8155,5306,5867,9633,14865.496.2
25Maine9861,1291,4941,62864265.1100.5
26Ohio3,2944,1385,0015,4152,12164.4139.1
27Nevada1,7482,3022,5802,8501,10263.0131.1
28Texas8,07610,29211,86813,1275,05162.5168.6
29Kentucky7479291,0471,21346662.4147.6
30Wyoming22827132336513760.187.9
31New Hampshire51868477182730959.7104.7
32Delaware45562674572527059.375.6
33Oregon2,8003,4253,9834,3511,55155.482.2
34Nebraska52160068979727653.0111.8
35Utah2,1202,5332,7433,2371,11752.7221.3
36Pennsylvania3,9094,9035,4815,9332,02451.8125.7
37Vermont9061,1161,3231,35845249.9185.6
38Virginia3,7174,7055,3735,5391,82249.083.6
39South Dakota22228031233010848.652.4
40Arizona3,2484,0144,4694,8221,57448.566.0
41Montana32642445648115547.565.8
42North Dakota1972342602838643.785.9
43Arkansas7768921,0741,11033443.0172.5
44West Virginia38445653354416041.773.0
45Louisiana61876982685223437.994.1
46Missouri2,4442,9333,2033,33789336.5153.1
47Kansas1,0711,1551,2951,44637535.087.6
48Hawaii7917769691,04825732.5169.1
49Rhode Island68180386089020930.792.5
50Maryland4,4144,8945,4025,6511,23728.087.5
51District of Columbia9671,0621,0721,08311612.027.1
United States154,432191,707231,090262,507108,07570.0126.9

Snapshots taken on October 26 of each year from the AFDC Station Locator historical view. Growth is net of closures and includes data-reporting changes.

Source: [1][2] U.S. Department of Energy, Alternative Fuels Data Center; U.S. Department of Energy, Alternative Fuels Data Center

Comparing year-end port counts with calendar-year registrations shows where charging kept pace with EVs. From the end of 2023 to the end of 2025, US public ports grew 48.4% while plug-in EV registrations grew 53.3%, and ports per 1,000 EVs slipped from 33.0 to 31.9. Ports per EV fell in 40 jurisdictions and rose in 11.

Connecticut gained the most, rising from 42.6 to 59.8 ports per 1,000 plug-in EVs (up 17.2) as its ports grew 111.1% against 50.4% EV growth. New York rose by 9.2. The largest falls came in the District of Columbia (down 26.2), Louisiana (down 22.8), where registrations grew 132.0%, and North Dakota (down 21.6).

Public ports versus plug-in EV registrations by state, 2023 to 2025 Download CSV
Show all 52 rows
StatePorts Dec 31 2023Ports Dec 31 2025Port growth (%)Plug-in EVs 2023Plug-in EVs 2025Plug-in EV growth (%)Ports per 1,000 EVs 2023Ports per 1,000 EVs 2025Change
Connecticut2,1294,495111.150,00075,20050.442.659.817.2
New York10,24418,39079.5223,600334,40049.645.855.09.2
Oklahoma1,2841,66930.055,80055,9000.223.029.96.9
New Mexico6451,13075.215,20023,70055.942.447.75.3
Alaska11519670.43,6005,40050.031.936.34.4
Massachusetts6,59910,30356.1117,600173,90047.956.159.23.1
Maine1,0151,55252.915,00022,20048.067.769.92.2
Alabama9111,65481.618,80032,70073.948.550.62.1
California43,07262,61445.41,667,3002,334,00040.025.826.81.0
Vermont9121,34347.313,50019,60045.267.668.50.9
New Jersey3,3995,47661.1175,700271,90054.819.320.10.8
Wisconsin1,3262,14061.437,40060,50061.835.535.4-0.1
Illinois3,2735,28761.5133,000216,50062.824.624.4-0.2
South Carolina1,2642,05162.329,90049,40065.242.341.5-0.8
Minnesota1,8772,89754.353,20084,60059.035.334.2-1.1
Oregon2,9204,12941.493,200136,90046.931.330.2-1.1
Washington5,3697,80745.4193,300293,50051.827.826.6-1.2
New Hampshire53779748.416,50025,60055.232.531.1-1.4
Idaho42363650.413,10020,80058.832.330.6-1.7
Iowa8041,23053.015,10023,90058.353.251.5-1.7
Tennessee1,9693,04354.544,20071,50061.844.542.6-1.9
Hawaii78396423.132,90044,50035.323.821.7-2.1
Arizona3,3694,61937.1115,400175,70052.329.226.3-2.9
Texas8,28512,16446.8285,400467,30063.729.026.0-3.0
Florida8,96713,65052.2312,200538,80072.628.725.3-3.4
North Carolina3,8445,82251.593,900156,50066.740.937.2-3.7
Georgia4,8047,31852.3115,100194,10068.641.737.7-4.0
Pennsylvania4,1105,66637.9109,100169,30055.237.733.5-4.2
Virginia4,0345,43934.8111,700174,20056.036.131.2-4.9
Mississippi39566869.15,60010,20082.170.565.5-5.0
Michigan3,1085,26069.279,400154,70094.839.134.0-5.1
Delaware50278155.612,20022,10081.141.135.3-5.8
Nevada1,8512,61541.358,000101,70075.331.925.7-6.2
Montana34246435.77,10011,10056.348.241.8-6.4
Rhode Island69286625.111,50016,10040.060.253.8-6.4
Indiana1,4372,01540.239,00066,60070.836.830.3-6.5
Utah2,1352,84133.153,00087,60065.340.332.4-7.9
Ohio3,4825,07645.874,400131,40076.646.838.6-8.2
Colorado4,9676,64833.8127,600219,90072.338.930.2-8.7
Kentucky8081,09535.517,20029,30070.347.037.4-9.6
Maryland4,5775,50220.2103,400162,00056.744.334.0-10.3
Nebraska54869627.010,70017,30061.751.240.2-11.0
Missouri2,6083,21923.440,80063,30055.163.950.9-13.0
Arkansas8001,08735.910,30017,20067.077.763.2-14.5
West Virginia41355935.44,6007,70067.489.872.6-17.2
Kansas1,1191,29215.516,90026,50056.866.248.8-17.4
South Dakota22731438.33,0005,40080.075.758.1-17.6
Wyoming24033338.71,9003,10063.2126.3107.4-18.9
North Dakota20527735.11,8003,00066.7113.992.3-21.6
Louisiana64084131.412,20028,300132.052.529.7-22.8
District of Columbia1,0241,0795.411,80017,80050.886.860.6-26.2
United States160,403238,00948.44,863,1007,454,80053.333.031.9-1.1

Year-end port counts (December 31) against calendar-year registration counts. A negative change means registrations grew faster than public ports. Oklahoma's flat EV count is driven by a fall in its reported plug-in hybrid registrations.

Source: [2][4] U.S. Department of Energy, Alternative Fuels Data Center; U.S. Department of Energy, Alternative Fuels Data Center

What the charger data means for electrical installs, panels and service upgrades

States that combine many EVs per public port with fast recent port growth show the strongest current demand for charger installation work. Federal rules for funded sites set high minimum power levels and specific installer credentials.

The install-pressure score ranks each state on two equal-weighted measures: plug-in EVs per public port at the end of 2025 (scarcity) and public port growth from October 2023 to October 2026 (momentum), each converted to a percentile from 0 to 100. New Jersey scores 99.0, with the most EVs per port (49.7) and the second-fastest port growth (119.2%). Illinois follows at 93.0, then Florida at 81.0, Idaho at 80.0 and Washington at 78.0. The District of Columbia (7.0), West Virginia (9.0) and North Dakota (10.0) score lowest.

Install-pressure score: the top 20 states

Equal-weight percentile score of EVs per public port and three-year port growth

Install-pressure score: the top 20 statesHorizontal bar chart of the install-pressure score. New Jersey scores 99.0, Illinois 93.0, Florida 81.0, Idaho 80.0 and Washington 78.0.score (0 to 100)New Jersey99.0Illinois93.0Florida81.0Idaho80.0Washington78.0Oklahoma76.0Michigan72.5California70.5Wisconsin70.5Nevada70.0Indiana69.5Texas68.0Minnesota67.0New Mexico65.0Colorado64.5Alaska63.0Alabama62.0South Carolina60.0Connecticut58.0New York57.0

Source: ECW Data Desk index built from U.S. DOE Alternative Fuels Data Center station and registration data

Install-pressure score by state (ECW Data Desk index) Download CSV
Show all 51 rows
RankStatePlug-in EVs per port (Dec 2025)Scarcity percentilePort growth 2023 to 2026 (%)Growth percentileInstall-pressure score
1New Jersey49.7100.0119.298.099.0
2Illinois40.996.098.390.093.0
3Florida39.594.073.068.081.0
4Idaho32.772.092.288.080.0
5Washington37.686.073.870.078.0
6Oklahoma33.580.075.672.076.0
7Michigan29.461.091.884.072.5
8California37.384.065.957.070.5
9Wisconsin28.355.092.086.070.5
10Nevada38.992.063.048.070.0
11Indiana33.175.069.864.069.5
12Texas38.490.062.546.068.0
13Minnesota29.258.080.576.067.0
14New Mexico21.034.0109.596.065.0
15Colorado33.175.065.454.064.5
16Alaska27.652.078.074.063.0
17Alabama19.830.0105.594.062.0
18South Carolina24.140.089.780.060.0
19Connecticut16.716.0158.8100.058.0
20New York18.222.0103.292.057.0
21Oregon33.278.055.436.057.0
22Arizona38.088.048.522.055.0
23New Hampshire32.170.059.740.055.0
24North Carolina26.950.065.957.053.5
25Georgia26.546.066.160.053.0
26Hawaii46.298.032.56.052.0
27Tennessee23.536.072.566.051.0
28Massachusetts16.918.091.282.050.0
29Utah30.866.052.732.049.0
30Louisiana33.782.037.912.047.0
31Ohio25.944.064.450.047.0
32Pennsylvania29.964.051.830.047.0
33Virginia32.068.049.026.047.0
34Delaware28.355.059.338.046.5
35Kentucky26.848.062.444.046.0
36Iowa19.426.069.062.044.0
37Mississippi15.310.082.978.044.0
38Nebraska24.942.053.034.038.0
39Maryland29.461.028.02.031.5
40Maine14.36.065.152.029.0
41Montana23.938.047.520.029.0
42South Dakota17.220.048.624.022.0
43Wyoming9.30.060.142.021.0
44Kansas20.532.035.08.020.0
45Missouri19.728.036.510.019.0
46Vermont14.68.049.928.018.0
47Arkansas15.812.043.016.014.0
48Rhode Island18.624.030.74.014.0
49North Dakota10.82.043.718.010.0
50West Virginia13.84.041.714.09.0
51District of Columbia16.514.012.00.07.0

Score = 0.5 x percentile rank of plug-in EVs per public port (December 2025) + 0.5 x percentile rank of three-year public port growth (October 2023 to October 2026). 100 = highest among the 50 states and DC.

Source: [1][2][4] U.S. Department of Energy, Alternative Fuels Data Center; U.S. Department of Energy, Alternative Fuels Data Center; U.S. Department of Energy, Alternative Fuels Data Center

Federally funded corridor sites carry specific electrical requirements. Under 23 CFR 680.106, a NEVI-funded corridor station needs at least four network-connected DC fast ports, each able to deliver 150 kW at the same time, which implies at least 600 kW of simultaneous output per site. DC ports must support 250 to 920 volts DC, funded Level 2 ports must deliver at least 6 kW, and each port must average more than 97% annual uptime (eCFR, 23 CFR Part 680).

The same rule sets installer credentials: electricians installing, operating or maintaining funded chargers must hold Electric Vehicle Infrastructure Training Program (EVITP) certification or a registered apprenticeship credential that includes charger-specific training. State licensing still applies; see the electrical license lookup by state.

Load per port is the other driver of panel and service work. AFDC notes that most residential Level 2 chargers run at up to 30 amps (7.2 kW) and need a dedicated 40-amp circuit under NEC Article 625, while public and workplace Level 2 equipment can operate at 40 to 80 amps. DC fast equipment, typically fed by three-phase service, reaches up to 500 kW. More background on charger, solar and low-voltage work is in our EV, solar and low-voltage guide, and contractor supply by state is in electrical contractor counts by state.

Against a long-range benchmark, NREL's 2030 National Charging Network study estimated that a 33 million EV fleet would need 182,000 public fast ports and about 1 million public Level 2 ports. October 2026 counts equal 43.5% of that fast-charging figure and 18.3% of the Level 2 figure. The study is a scenario, not a mandate.

Commercial electrical panel with new breakers and copper conductors prepared for charger circuits
Illustrative photograph. Generated image, not a specific project.

How we ranked the states

Public ports per 1,000 registered plug-in EVs, by state

Formulapublic ports on 2025-12-31 / (BEV registrations 2025 + PHEV registrations 2025) x 1,000

Inputs: fact sheet rows for ports_2025ye, bev_2025 and phev_2025 of each state (see derived_metrics.csv) (fact sheet rows)

Result: US 31.9; lowest New Jersey 20.1; highest Wyoming 107.4

Large EV markets such as New Jersey, Illinois, Florida and California have fewer public ports per EV than the US figure, while rural states with few EVs show high ratios driven by corridor chargers.

Limitations: Registrations are rounded to 100 and reflect vehicles registered through 2025; home charging, which most EV owners use, is not counted. Oklahoma's PHEV count may be a classification artifact.

Public ports per 100,000 residents, by state

Formulapublic ports on 2026-10-26 / July 1, 2025 population x 100,000

Inputs: fact sheet rows for ports_2026 and pop_2025 of each state (fact sheet rows)

Result: US 76.8; Vermont 210.7; Louisiana 18.4

Per-capita access is highest in New England and California and lowest across parts of the South.

Limitations: Population and port dates differ by about 15 months; population is an estimate.

Three-year growth in public ports, by state

Formula(ports on 2026-10-26 / ports on 2023-10-26 - 1) x 100

Inputs: fact sheet rows for ports_2026 and ports_2023 of each state (fact sheet rows)

Result: US 70.0%; Connecticut 158.8%; District of Columbia 12.0%

Five states at least doubled public ports; growth was slowest in the District of Columbia, Maryland and Rhode Island.

Limitations: Net of closures; historical locator views can include later data corrections and network reporting changes.

Change in ports per 1,000 plug-in EVs, end 2023 to end 2025

Formulaports per 1,000 plug-in EVs (2025) - ports per 1,000 plug-in EVs (2023)

Inputs: fact sheet rows for ports_2023ye, ports_2025ye and BEV and PHEV registrations for 2023 and 2025 (fact sheet rows)

Result: US down 1.1 (33.0 to 31.9); Connecticut up 17.2; District of Columbia down 26.2

EV registrations outpaced public ports in 40 of 51 jurisdictions, so the gap between EVs and public charging widened in most states.

Limitations: Two-year window; ratio differences use rounded ratios.

Install-pressure score

Formula0.5 x percentile rank of plug-in EVs per public port (Dec 2025) + 0.5 x percentile rank of three-year port growth (Oct 2023 to Oct 2026); percentile = (average rank - 1) / 50 x 100, lowest value = 0

Inputs: derived metrics d1 (inverted as EVs per port) and d3 for each state (fact sheet rows)

Result: New Jersey 99.0; Illinois 93.0; Florida 81.0; Idaho 80.0; Washington 78.0; lowest District of Columbia 7.0

A high score marks a state where public charging is scarce relative to EVs and where installs have been moving fast, the combination most associated with current charger installation activity.

Limitations: Equal weights are a design choice; the score is relative, ignores charger power, private and home charging, and does not measure contractor workload directly.

Get the calculations (CSV)

State by state

  1. The US had 262,507 public EV charging ports at 83,527 station locations on October 26, 2026 (AFDC, public access, temporarily unavailable excluded).[1]
  2. California had 69,621 public ports at 20,379 station locations in October 2026, 26.5% of all US public ports.[1]
  3. New York ranked second with 20,419 public ports, followed by Florida with 15,426, Texas with 13,127 and Massachusetts with 11,834 (October 2026).[1]
  4. Alaska had the fewest public ports of any state, 194, followed by North Dakota with 283 and South Dakota with 330 (October 2026).[1]
  5. US public DC fast ports rose from 34,904 in October 2023 to 79,187 in October 2026, a 126.9% increase, while public Level 2 ports rose 54.0% to 182,615.[1][2]
  6. Oklahoma had the highest DC fast share of public ports in October 2026 at 61.3%; the District of Columbia had the lowest at 5.6%.[1]
  7. Vermont had 210.7 public ports per 100,000 residents in October 2026, the most of any state; Louisiana had 18.4, the fewest; the US figure was 76.8.[1][5]
  8. At the end of 2025 the US had 31.9 public ports per 1,000 registered plug-in EVs, or 31.3 plug-in EVs per public port.[2][4]
  9. New Jersey had 20.1 public ports per 1,000 plug-in EVs at the end of 2025 (49.7 EVs per port), the lowest ratio of the 50 states and DC.[2][4]
  10. Wyoming had 107.4 public ports per 1,000 plug-in EVs at the end of 2025, the highest ratio, followed by North Dakota at 92.3.[2][4]
  11. From the end of 2023 to the end of 2025, US public ports grew 48.4% and plug-in EV registrations grew 53.3%, so ports per 1,000 EVs fell from 33.0 to 31.9.[2][4]
  12. Connecticut's public ports grew 158.8% from October 2023 to October 2026, the fastest of any state, and its ports per 1,000 plug-in EVs rose by 17.2 between 2023 and 2025.[1][2][4]
  13. US net public port additions fell to 31,417 in the year to October 2026, from 39,383 a year earlier; annual growth slowed from 24.1% to 20.5% to 13.6%.[1][2]
  14. Public DC fast ports in October 2026 equalled 43.5% of the 182,000 public fast ports NREL estimated the US would need in 2030 under a 33 million EV scenario.[1][14]

In short

  • The US had 262,507 public EV charging ports at 83,527 station locations on October 26, 2026, according to the DOE Alternative Fuels Data Center (AFDC).
  • California alone held 69,621 public ports, 26.5% of the US total; the top five states (California, New York, Florida, Texas, Massachusetts) held 49.7%.
  • DC fast ports reached 79,187 in October 2026, 30.2% of public ports, up from 22.6% in October 2023.
  • At the end of 2025 the US had 31.9 public ports per 1,000 registered plug-in EVs; New Jersey had 20.1, Hawaii 21.7 and Illinois 24.4, while Wyoming had 107.4.
  • Public ports grew 48.4% from the end of 2023 to the end of 2025, while plug-in EV registrations grew 53.3%, so ports per EV fell in 40 of 51 jurisdictions.
  • Net port additions slowed: 37,275 in the year to October 2024, 39,383 in the year to October 2025 and 31,417 in the year to October 2026 (13.6% growth).
  • On an install-pressure score that combines EVs per port with three-year port growth, New Jersey (99.0), Illinois (93.0) and Florida (81.0) rank highest.

What people search for

Which state has the most EV charging stations?

California, with 20,379 public station locations and 69,621 public charging ports on October 26, 2026, or 26.5% of all US public ports (DOE AFDC). New York is second with 20,419 ports.

How many EV chargers are in the US?

The DOE AFDC counted 262,507 public EV charging ports at 83,527 station locations on October 26, 2026, excluding temporarily unavailable stations. Of those, 182,615 were Level 2 and 79,187 were DC fast. Including private non-residential chargers the count is 291,256 ports.

Which states have the fewest chargers per EV?

At the end of 2025, New Jersey had 20.1 public ports per 1,000 registered plug-in EVs, the lowest ratio, followed by Hawaii (21.7), Illinois (24.4), Florida (25.3) and Nevada (25.7). The US figure was 31.9 (DOE AFDC station and registration data).

Common questions

How many public EV charging ports does Texas have?

Texas had 13,127 public charging ports at 3,858 station locations on October 26, 2026, the fourth most of any state (DOE AFDC). DC fast ports made up 43.3% of them, and Texas had 26.0 public ports per 1,000 registered plug-in EVs at the end of 2025.

What is the difference between an EV charging station and a charging port?

AFDC defines a station location as a physical place with one or more ports, such as a parking lot. A port charges one vehicle at a time, even if it has several connectors. The US had 83,527 public station locations and 262,507 public ports on October 26, 2026.

Which state has the most EV chargers per person?

Vermont, with 210.7 public ports per 100,000 residents in October 2026, followed by California at 176.9 and Massachusetts at 165.4. The US figure was 76.8, using Census Vintage 2025 population (DOE AFDC; U.S. Census Bureau).

How many DC fast chargers are there in the US?

The DOE AFDC listed 79,187 public DC fast ports on October 26, 2026, up from 34,904 on October 26, 2023, an increase of 126.9%. DC fast ports were 30.2% of all public ports in October 2026.

Is EV charger growth slowing?

Yes, on net additions. US public ports grew 24.1% in the year to October 2024, 20.5% in the year to October 2025 and 13.6% in the year to October 2026, when 31,417 ports were added (DOE AFDC historical counts).

Has public charging kept up with EV sales?

Not nationally. From the end of 2023 to the end of 2025, US public ports grew 48.4% while registered plug-in EVs grew 53.3%, so public ports per 1,000 EVs fell from 33.0 to 31.9. The ratio fell in 40 of 51 jurisdictions (DOE AFDC).

What is the status of the federal NEVI charging program?

FHWA's NEVI page, last updated February 5, 2026, links the NEVI Formula Program Interim Final Guidance dated August 11, 2025. Ohio reported 19 operational NEVI stations in April 2026 and selected 64 new sites, according to Spectrum News reporting of Ohio DOT figures.

What do NEVI-funded chargers require electrically?

Under 23 CFR 680.106, corridor stations need at least four DC fast ports able to deliver 150 kW each at the same time, output between 250 and 920 volts DC, and more than 97% average annual uptime per port. Installing electricians need EVITP certification or a qualifying registered apprenticeship credential.

How many public chargers will the US need by 2030?

NREL's 2030 National Charging Network study estimated that a fleet of 33 million plug-in EVs would need 182,000 public fast ports and about 1 million public Level 2 ports. October 2026 public DC fast ports equal 43.5% of the fast-port figure (DOE AFDC; NREL).

Why do EV charger counts differ between sources?

Sources use different dates and filters. AFDC listed 262,507 public ports excluding temporarily unavailable stations and 268,116 including them on October 26, 2026. The Joint Office shows 267,400, The Motley Fool reported 259,687 on October 5, 2026, and the Alliance for Automotive Innovation counted 242,354 in Q1 2026.

Get the data

Every table in this report is available as a CSV under CC BY 4.0. The fact sheet lists each value with its source URL and access date.

Cite this report

The figures to cite first

  1. 262,507 public EV charging ports in the US on October 26, 2026 (DOE AFDC).[1]
  2. 31.9 public ports per 1,000 registered plug-in EVs nationally at the end of 2025, down from 33.0 at the end of 2023 (DOE AFDC, ECW calculation).[2][4]
  3. New Jersey, Illinois and Florida rank highest on install pressure, combining many EVs per public port with fast port growth (ECW Data Desk index).[1][2][4]

Quotable figures

  • The US had 262,507 public EV charging ports at 83,527 station locations on October 26, 2026, according to DOE Alternative Fuels Data Center counts.[1]
  • New Jersey had 20.1 public charging ports per 1,000 registered plug-in EVs at the end of 2025, the lowest ratio of the 50 states and DC.[2][4]
  • From the end of 2023 to the end of 2025, US public charging ports grew 48.4% while plug-in EV registrations grew 53.3%.[2][4]
  • US public DC fast charging ports rose 126.9% in three years, from 34,904 in October 2023 to 79,187 in October 2026.[1][2]
  • Net additions of US public charging ports slowed to 31,417 in the year to October 2026, growth of 13.6%, down from 24.1% two years earlier.[1][2]
  • Vermont had 210.7 public EV charging ports per 100,000 residents in October 2026, Louisiana 18.4.[1][5]

Summary for editors

Public EV charging in the United States reached 262,507 ports at 83,527 locations on October 26, 2026, according to Department of Energy counts analysed by the Electrical Contractors and Wiring Data Desk. California held 69,621 ports, 26.5% of the national total. Normalised by registered plug-in EVs, the picture shifts: New Jersey had 20.1 public ports per 1,000 EVs at the end of 2025, against 31.9 nationally and 107.4 in Wyoming. Public ports grew 70.0% from October 2023 to October 2026, and DC fast ports grew 126.9%, but EV registrations rose faster than ports in 40 of 51 jurisdictions between 2023 and 2025. Net additions slowed to 31,417 ports in the latest year. An install-pressure score combining EVs per port with port growth ranks New Jersey, Illinois and Florida highest. All state tables are available as CSV files under CC BY 4.0.

Headlines the data supports

  • US public EV charging ports reach 262,507, but EVs are still outpacing them
  • New Jersey has the fewest public chargers per EV: 20.1 ports per 1,000 plug-in EVs
  • DC fast chargers more than double in three years, up 126.9% since October 2023
  • Public EV charger growth slows to 13.6% as net additions fall to 31,417
  • New Jersey, Illinois and Florida top a new EV charger install-pressure ranking

Citation

Electrical Contractors and Wiring. (2026). EV Charging Stations by State: Public Ports, Ports per EV and Growth, 2023 to 2026. Retrieved from https://electricalcontractorsandwiring.com/data/ev-charging-stations-by-state/

Reuse

Data and tables are licensed CC BY 4.0. Attribution: “Source: Electrical Contractors and Wiring, EV Charging Stations by State: Public Ports, Ports per EV and Growth, 2023 to 2026” with a link to this page.

How we built this report

Source selection: station counts come from the DOE Alternative Fuels Data Center (AFDC) Station Counts by State page, which reports public station locations, ports and the Level 1, Level 2 and DC fast split for every state. Current counts were pulled on 2026-10-26 (AFDC data last updated 10/26/2026). Historical counts use the same page's historical date filter for October 26, 2023, 2024 and 2025 and for December 31, 2023 and 2025. EV registrations come from AFDC Vehicle Registration Counts by State for 2023 and 2025; population from the Census Bureau Vintage 2025 state file released January 27, 2026. The NREL API was not used because it needs a key.

Inclusion rules: public access only, temporarily unavailable stations excluded (the AFDC default). Private non-residential chargers and home chargers are excluded from all state figures. Plug-in EVs are battery EVs plus plug-in hybrids; DC fast ports per EV use battery EVs only because most plug-in hybrids cannot fast charge. All 50 states and DC are included.

Conflicting numbers: national charger counts differ by source because of filters and dates. AFDC public excluding temporarily unavailable (262,507) is used throughout; AFDC including them (268,116), the Joint Office progress figure (267,400), The Motley Fool (259,687, October 5, 2026), the Alliance for Automotive Innovation (242,354, Q1 2026) and the AFDC public-plus-private annual workbook (271,488 for December 2025) are reported for comparison only. In a few states (California, Connecticut, Michigan) AFDC's Level 1, Level 2 and DC fast columns sum to slightly fewer ports than the port total; the published port total is used.

Derived metrics: ports per 1,000 plug-in EVs pairs December 31, 2025 port counts with 2025 registrations so both refer to the end of the same year. Three-year growth uses October 26 snapshots from 2023 and 2026. The install-pressure score averages two percentile ranks (EVs per port and three-year port growth) with equal weight; percentiles use average ranks across the 51 jurisdictions. Every formula and input row is listed in derived_metrics.csv, and the Python scripts in scripts/ reproduce all tables from the saved raw files.

Limitations: historical AFDC views reflect locator records for past dates and include network reporting changes, so growth is net of closures and corrections. Registrations are modelled estimates rounded to 100. Oklahoma's plug-in hybrid count exceeds its battery EV count, unlike any other state, which affects its ratios and its flat 2023 to 2025 EV growth (0.2%). Port counts do not measure charger power, utilisation or reliability. AFDC's quarterly charging trends reports end with the second quarter 2024 edition, so this report relies on direct locator counts.

Last update: 2026-10-26. Data and tables are licensed CC BY 4.0. Attribution: Electrical Contractors and Wiring Data Desk, EV Charging Stations by State (2026), electricalcontractorsandwiring.com.

This report presents published data with its limitations. It is not legal, financial or investment advice.